Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in AR

Put In

Mikes Creek - Ozone to Little Piney Creek (6 + 4 miles) (AR)

Gauge Conditions
Runnable: ? – ? CFS

Approximate - nearest available gauge. Use as general reference only.

Photo
Put In
Photo courtesy of American Whitewater
Description
Put In rapid marks the entry point for this challenging section of Mikes Creek, featuring a tight technical entry with multiple boulder pinch points that require precise boat positioning. Paddlers should be prepared for closely spaced rocks and potential hydraulics that demand quick maneuvering, with minimal margin for error in the initial drop.
Location

Other Rapids on This Run (1)

Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
Ozone to Little Piney Creek (6 + 4 miles)
Mikes Creek
III-IV 10.6 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater