Whitewater Run WV Class II-III

Hacker Valley to Mill Dam

Holly River, Left Fork

Linked via: Nhdplus created 95% confidence Synced 3mo ago

Monitor
Gauge Conditions
Runnable: 6.0 – 8.2 FT
Run Map
Run Time Estimate
Select put-in and take-out to estimate time.
Unlock Advanced Trip Planning

See wind-adjusted speed maps, forecast planning, and detailed time estimates.

Sign in to generate an AI timing estimate for this run.
Whitewater timing varies with scouting, portages, and group pace. Use as a planning baseline.
Description
The Left Fork is considered the mainstem of the Holly River. At the end of the run a wooden mill dam incorporates a natural ledge and is runnable on river right.
Difficulty
Class II-III
Length
9.9 mi
Gradient
45 ft/mi
Rapids
0
Difficulty Classes
I Easy II Novice III Intermediate IV Advanced V Expert/Extreme VI Unrunnable
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater