Sign in to generate an AI timing estimate for this run.
Whitewater timing varies with scouting, portages, and group pace. Use as a planning baseline.
Description
Known to have been run, per Texas Whitewater. Described as full of dangerous dams and barbed wire. Difficulty rating and range of recommended flows are taken from the book.
Put-in is approximately 880' elevation.
Take-out is approximately 770' elevation.
Therefore total elevation change is approximately 110'.