Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in WA

High Bridge Put-In

Wind - 4. High Bridge to Columbia River (WA)

Gauge Conditions
Wind River near Carson, WA Downstream Primary
Runnable: ? – ? CFS

Approximate - nearest available gauge. Use as general reference only.

Description

The access is on river right. From Highway 14 at mile 47.4, head north into Carson on Wind River Road. To reach the take-out continue to mile 3.0 on Wind River Road and turn left onto High Bridge Road. Head 0.1 mile and turn right on Detour Road. Detour road winds 0.7 mile down to the river. The parcel at the river is owned by Skamania County.

Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
4. High Bridge to Columbia River
Wind
IV-V(V+) 5.2 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater