Located upstream of the reach that is typically boated, Lucky Peak Dam is a 340' high rolled earth and gravel fill embankment dam constructed in the early 1950s, The dam's primary purpose is flood control, with a secondary purpose of irrigation. It also produces up to 101 MW of hydropower (P-2832).
Hazard
N/A
Hazard
N/A
Hazard
N/A
Hazard
N/A
Rapid
N/A
Rapid
II
Rapid
N/A
Rapid
N/A
Rapid
III
Rapid
N/A