Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in MA

Put In

Farmington, W. Branch - 1. Upper New Boston (MA)

Gauge Conditions
Runnable: 3.8 – 7.0 FT
Photo
Put In
Photo courtesy of American Whitewater
Description
Put In Rapid marks the starting point for the Upper New Boston section, featuring a straightforward entry with minimal technical challenges. Paddlers should be aware of potential shallow areas and scattered rocks near the river's edge, which may require careful navigation during lower water levels.
Location

Other Rapids on This Run (1)

Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
1. Upper New Boston
Farmington, W. Branch
II 2.3 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater