Put In rapid marks the starting point for this section of the Dearborn River, with potential challenging entry conditions depending on water levels. Paddlers should be prepared for potential rocks and uneven flow near the launch area, carefully scouting the initial line and assessing current hydraulics before putting in. Local knowledge and careful route selection are critical at this transition point from the roadside access to the river proper.