Put In rapid marks the start of the Oswegatchie's technical run, with a complex entry that requires precise boat positioning to avoid shallow rock gardens and potential pin spots. Paddlers should scout carefully from river left and be prepared for tight maneuvering through a series of small drops and constricted channels that can quickly develop hydraulics at varying water levels.