Put In rapid marks the starting point for a run down Stebbins Creek, with an initially technical entry that requires precise boat positioning to navigate the narrow channel. Limited beta exists on this section, so paddlers should scout carefully and be prepared for potential wood hazards or unexpected obstacles in this less-traveled watershed.