The River Mill Dam is located at USGS river mile 22.3 and is the most downstream of the series of dams that make up the Clackamas Hydroelectric Project. It has five Francis turbines with a combined maximum generation capacity of 25 MW. It was originally constructed in 1911.
Rapid
N/A
Rapid
II
Rapid
II
Rapid
N/A
Rapid
N/A
Rapid
N/A
Rapid
N/A
Rapid
N/A
Rapid
III
Rapid
N/A
Rapid
N/A