Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Take-out VT

Take-out

Mad - 2.) 1st Hydro Dam to Winooski River (VT)

Gauge Conditions
Runnable: 300.0 – 1,700.0 CFS
Photo
Take-out
Photo courtesy of American Whitewater
Description
Take-out rapid at the first hydroelectric dam presents a complex exit point with potential hydraulic hazards from dam infrastructure and potential water level fluctuations. Paddlers should carefully scout the downstream exit, watching for potential concrete structures, potential debris, and any sudden changes in water flow near the dam's outflow. Careful route selection and precise boat positioning are critical to safely navigating this transition zone.
Location
Type
Take-out
Difficulty
Class N/A
Mile Marker
2.0 mi
Directions
View Full Run
2.) 1st Hydro Dam to Winooski River
Mad
II-III+(IV) 2.1 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater