Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Take-out VT

Take Out

Green (Deerfield River Trib.) - W. Leyden to covered bridge (VT)

Gauge Conditions
Runnable: 250.0 – 2,000.0 CFS

Upper limit for best boatability uncertain. Please help your fellow boaters with a comment or report.

Photo
Take Out
Photo courtesy of American Whitewater
Description
Take Out rapid presents a technical descent with multiple exposed boulder gardens requiring precise boat positioning and line selection. Paddlers should be prepared for potential pin hazards and closely spaced rocks that demand continuous maneuvering through the narrow channel. Scout thoroughly from river right to identify the cleanest route and assess current water levels, which significantly impact the rapid's navigability.
Location

Other Rapids on This Run (1)

Type
Take-out
Difficulty
Class N/A
Mile Marker
5.6 mi
Directions
View Full Run
W. Leyden to covered bridge
Green (Deerfield River Trib.)
II-III 6.4 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater