Approximate - nearest available gauge. Use as general reference only.
This is a two part rapid just down stream of the powerlines. The scout pool is directly under the powerlines. It's a 2 part rapid and the 5' ledge is a lot of work to scout, as it's the second part of the rapid around a blind turn, with one small eddy river left before the ledge. The eft and center pourovers both went fine at 300 cfs.