Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Take-out WV

Take Out

Meadow Creek (New River trib.) - 1. Meadow Bridge to Claypool (WV)

Gauge Conditions
Piney Creek at Raleigh, WV Downstream Primary
Runnable: 3.7 – 5.7 FT
Photo
Take Out
Photo courtesy of American Whitewater
Description
Take Out is a transition rapid marking the end of the Meadow Creek run, characterized by a tight channel with potential for pinning hazards among scattered rocks and debris. Paddlers should maintain careful boat control through this technical exit point, which can become more challenging at varying water levels and may require precise maneuvering to avoid obstacles.
Location

Other Rapids on This Run (1)

Type
Take-out
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
1. Meadow Bridge to Claypool
Meadow Creek (New River trib.)
IV+ 3.4 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater