Approximate - nearest available gauge. Use as general reference only.
Amphitheater, class V-. This is the first major rapid below Ash Camp, and might be described as a “rock pile” just upstream of a curving river right wall that inspires the rapid’s name. The rapid requires an in-channel portage around the steepest, boulder-choked section at low flows, but is run at higher flows on the left.
Rapid
N/A