Emerson Mill
Save this feature with the run it belongs to.
Gauge Conditions
Runnable: ? – ? CFS
Approximate - nearest available gauge. Use as general reference only.
Data from American Whitewater & USGS
Photo
Photo courtesy of American Whitewater
Description
Set up center right and start to drive right. There is a clear tongue here. Open boater take the line on the left almost in the trees. This can also be a fun little boof in a kayak. After the bridge there is a wave train with a surfable wave towards the end (some times). The gauge is painted on the river left side of the bridge.
Location
Interactive river map
Loads as you approach this section.
View Full Run
Manning Mill Bridge to Rt.1A in Hampden
Souadabscook Stream
III+(IV)
3.2 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater
American Whitewater