Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in AR

Put In

Little Missouri - 1) Albert Pike Campgound to Highway 84 Bridge (8.5 miles) (AR)

Gauge Conditions
Runnable: 5.0 – 7.0 FT
Photo
Put In
Photo courtesy of American Whitewater
Description
Put In is the starting point for the Little Missouri River run, marking the entry into a remote wilderness section with minimal beta and potential wood hazards. Paddlers should scout thoroughly and be prepared for blind drops and potential strainers, as the river character can change rapidly with water levels and seasonal conditions.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
1) Albert Pike Campgound to Highway 84 Bridge (8.5 miles)
Little Missouri
II-III+(IV) 8.8 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater