Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in CT

Put In

Housatonic - 3. Bulls Bridge Dam to Power Plant (CT)

Gauge Conditions
Runnable: 800.0 – 10,000.0 CFS

When the Hydro Plant is offline (as it is through the winter of 2015/16) the whole run is easily navigable down to around 650 cfs (~1ft on the boater's gauge)

Photo
Put In
Photo courtesy of American Whitewater
Description
Put In is the initial entry point for the Bulls Bridge section, characterized by a straightforward but technical launch location with potential for swift current and limited maneuvering space. Paddlers should be attentive to potential river obstacles near the dam and carefully assess water levels and flow before entering, as the immediate downstream conditions can vary significantly with water release rates.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
3. Bulls Bridge Dam to Power Plant
Housatonic
IV 2.1 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater