Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Take-out CT

Take Out

Housatonic - 3. Bulls Bridge Dam to Power Plant (CT)

Gauge Conditions
Runnable: 800.0 – 10,000.0 CFS

When the Hydro Plant is offline (as it is through the winter of 2015/16) the whole run is easily navigable down to around 650 cfs (~1ft on the boater's gauge)

Photo
Take Out
Photo courtesy of American Whitewater
Description
Take Out marks the end of the Bulls Bridge section, serving as a critical transition point for paddlers exiting the river near the power plant. While specific details about technical features are limited, this location requires careful navigation and awareness of potential takeout logistics and potential hazards near the dam infrastructure.
Location
Type
Take-out
Difficulty
Class N/A
Mile Marker
2.2 mi
Directions
View Full Run
3. Bulls Bridge Dam to Power Plant
Housatonic
IV 2.1 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater