Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in GA

Put In

Hazel Creek - US 441 Bus. to Duncan Bridge (GA)

Gauge Conditions
Runnable: 2.0 – 8.0 FT
Photo
Put In
Photo courtesy of American Whitewater
Description
Put In rapid marks the starting point for this Hazel Creek run, featuring a straightforward entry with minimal technical challenges. Paddlers should be aware of potential shallow rock gardens and pick a clean line through the initial water to avoid potential boat or gear damage. While not a particularly difficult rapid, proper boat positioning and initial momentum are key for a smooth launch into the downstream section.
Location

Other Rapids on This Run (1)

Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
US 441 Bus. to Duncan Bridge
Hazel Creek
III+ 9.3 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater