Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Take-out GA

Take Out

Hazel Creek - US 441 Bus. to Duncan Bridge (GA)

Gauge Conditions
Runnable: 2.0 – 8.0 FT
Photo
Take Out
Photo courtesy of American Whitewater
Description
Take Out rapid on Hazel Creek is the final navigable stretch before Duncan Bridge, characterized by a technical boulder garden with multiple potential routes requiring precise maneuvering. Paddlers should be prepared for tight spaces between rocks and potential pinning hazards, with the main line requiring careful boat positioning and momentum through a series of closely spaced obstacles.
Location

Other Rapids on This Run (1)

Type
Take-out
Difficulty
Class N/A
Mile Marker
9.2 mi
Directions
View Full Run
US 441 Bus. to Duncan Bridge
Hazel Creek
III+ 9.3 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater