Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in MA

Put In

Farmington, W. Branch - 2. New Boston (MA)

Gauge Conditions
Runnable: 4.0 – 7.0 FT

The fall release level is around 3.8 feet which is very low. If the low end was marked higher then the AW listing would indicate that the river was too low.

Photo
Put In
Photo courtesy of American Whitewater
Description
Put In is an entry point rapid with a straightforward approach, marking the beginning of the New Boston section on the West Branch Farmington. Paddlers should be aware of potential submerged rocks and variable water levels that can impact line selection and difficulty. While not a technical challenge, careful navigation is recommended to ensure a clean entry into the downstream rapids.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
2. New Boston
Farmington, W. Branch
III 2.9 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater