Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in MI

Put In

Sturgeon, W.Br. (Houghton) - Newberry Rd to S.Laird Rd (5.7 miles) (MI)

Gauge Conditions
Runnable: 6.6 – 8.0 FT

Likely too low for areas of gradient to be boatable.

Photo
Put In
Photo courtesy of American Whitewater
Description
Put In rapid serves as the entry point to this section of the Sturgeon River, offering paddlers an immediate introduction to the river's character. While specifics are limited, the rapid likely presents initial navigational challenges with potential obstacles near the put-in location that require careful maneuvering. Paddlers should scout the rapid and assess current water levels before committing to their line.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
Newberry Rd to S.Laird Rd (5.7 miles)
Sturgeon, W.Br. (Houghton)
I-IV 4.5 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater