Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Rapid WA

Proposed Reservoir Upstream End

Chehalis - 1 - West Fork to Pe Ell (WA)

Gauge Conditions
Runnable: 500.0 – 3,500.0 CFS
Photo
Proposed Reservoir Upstream End
Photo courtesy of American Whitewater
Description

In Feb 2009 Lewis County PUD released a draft study for a water retention facility and hydropower project with a reservoir that would innundate a 9.6 mile portion of this run approximately to this point. Located at USGS river mile 117.9 mile. Various iterations of this proposed dam have continued to persist.

Location
Type
Rapid
Difficulty
Class N/A
Mile Marker
0.6 mi
Directions
View Full Run
1 - West Fork to Pe Ell
Chehalis
III-IV 13.8 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater